Search Results

All content (like policies or maps) is tagged with one or more terms. Select a Topic or Geography to search the Policy Plan, Business Plan, and Community Action Guides for related content. You will be able to apply additional filters to further refine the search results.

Narrow results by applying additional filters

Topics

Geographies

Showing results for:

  • Policies
    1. Policy LU-6.1 Residential amendments that increase density in the Desert and Mountain regions

      We discourage policy plan amendments that would permit new development on lots smaller than 2.5 acres in the Desert regions and lots smaller than one-half acre in the Mountain region. We approve general plan amendments that would increase residential density only if:
      • The proposed change is determined to be compatible in accordance with policies
      LU-2.1, 2.2, 2.3, and 4.5.
      • Adequate infrastructure and services are available concurrently.
      • The increase in density would not degrade existing levels of service for fire protection, sheriff, water, or wastewater service in the area.

      GO TO POLICY
    2. Policy LU-6.2 Large residential development in the Desert and Mountain regions

      We require a specific plan or Planned Development process for proposed residential development in the:
      • North or East Desert regions: when the proposed development would include one or more lots that is 2.5 acres or smaller and the overall development would cover 40 or more acres.
      • Mountain region: when the proposed development would include one or more lots that is 1 acre or smaller and the overall development would cover 40 or more acres.

      GO TO POLICY
  • Policies
    1. Policy H-5.2 Local organizations

      We utilize local organizations that provide fair housing services to the San Bernardino County area to better prevent, monitor, and resolve fair housing issues. We also utilize local organizations to provide housing information, counseling, and financial literacy to lower income households.

      GO TO POLICY
  • Goals
    1. Goal IU-3 Stormwater Drainage

      A regional stormwater drainage backbone and local stormwater facilities in unincorporated areas that reduce the risk of flooding

      GO TO GOAL
    Policies
    1. Policy IU-1.7 Areas vital for groundwater recharge

      We allow new development on areas vital for groundwater recharge when stormwater management facilities are installed onsite and maintained to infiltrate predevelopment levels of stormwater into the ground.

      GO TO POLICY
    2. Policy IU-1.11 Water storage and conveyance

      We assist in development of additional water storage and conveyance facilities to create a resilient regional water supply system, when it is cost effective for County-owned water and stormwater systems.

      GO TO POLICY
    3. Policy IU-3.1 Regional flood control

      We maintain a regional flood control system and regularly evaluate the need for and implement upgrades based on changing land coverage and hydrologic conditions in order to manage and reduce flood risk. We require any public and private projects proposed anywhere in the county to address and mitigate any adverse impacts on the carrying capacity and stormwater velocity of regional stormwater drainage systems.

      GO TO POLICY
    4. Policy IU-3.2 Local flood control

      We require new development to install and maintain stormwater management facilities that maintain predevelopment hydrology and hydraulic conditions.

      GO TO POLICY
    5. Policy IU-3.3 Recreational use

      We prefer that stormwater facilities be designed and maintained to allow for regional open space and safe recreation use without compromising the ability to provide flood risk reduction.

      GO TO POLICY
    6. Policy IU-3.4 Natural floodways

      We retain existing natural floodways and watercourses on County-controlled floodways, including natural channel bottoms, unless hardening and channelization is the only feasible way to manage flood risk. On floodways not controlled by the County, we encourage the retention of natural floodways and watercourses. Our priority is to reduce flood risk, but we also strive to protect wildlife corridors, prevent loss of critical habitat, and improve the amount and quality of surface water and groundwater resources.

      GO TO POLICY
    7. Policy IU-3.5 Fair share requirements

      We require new development to pay its fair share of capital costs to maintain adequate capacity of the County’s regional flood control systems.

      GO TO POLICY
    Related Materials
    1. Policy Maps IU-4 Regional Flood Control Facilities (PDF | WEB)
  • Policies
    1. Policy NR-2.5 Stormwater discharge

      We ensure compliance with the County’s Municipal Stormwater NPDES (National Pollutant Discharge Elimination System) Permit by requiring new development and significant redevelopment to protect the quality of water and drainage systems through site design, source controls, stormwater treatment, runoff reduction measures, best management practices, low impact development strategies, and technological advances. For existing development, we monitor businesses and coordinate with municipalities.

      GO TO POLICY
  • Policies
    1. Policy HZ-1.7 Underground utilities

      We require that underground utilities be designed to withstand seismic forces, accommodate ground settlement, and hardened to fire risk.

      GO TO POLICY
    1. FOCUS STATEMENT H - Maintain roadway infrastructure and improve traffic flow and vehicle safety within the communities
      Action Statement H.4

      Advocate with the County and Caltrans to regularly maintain public roadways and drainage infrastructure.

      GO TO ACTION PLAN